Seattle Parks and Recreation to replace beach pilings at Green Lake starting Tuesday

by | Nov 22, 2016

Seattle Parks and Recreation will replace the wood pilings at both the east and west swimming beaches at Green Lake Park with steel piles beginning Tuesday. The pilings secure swim area ropes and floats.

The Green Lake Trail will be temporarily closed near the Small Craft Center on the east side Tuesday morning to launch the barge and crane. The trail will need to be closed again on Dec. 6 to remove the barge and crane.

Recent Posts

2024 Bite of PhinneyWood tickets nearly sold out

2024 Bite of PhinneyWood tickets nearly sold out

Vitality Pilates offering free Pilates in the Park series in Greenwood

Vitality Pilates offering free Pilates in the Park series in Greenwood

Pop Up Modernist Gallery to be featured at this year’s Art Walk

Pop Up Modernist Gallery to be featured at this year’s Art Walk