NW 80th Street is currently closed for pavement repairs. It is scheduled to reopen at 8 a.m. Sunday. It remains open to pedestrians. The Seattle Department of Transportation is replacing several concrete panels. Traffic will be detoured to NW 85th Street, but be willing to bet on increased traffic on 81st through 84th.
NW 80th St from 3rd to 8th closed for repairs
Next post: Greenwood Park P-Patch proposal
Previous post: Childish Things kids store opens on Holman